MEDISPA.PRO
2.7.3 2.7 · Thermal zone: heat cabins, cold, showers, pools and relaxation (Термальная зона)

Room 2.7.3 · Steam room

Industry analytical passport of room type Hydro-balneological spa complex. Full profile of architectural TEP, medical equipment specification (CapEx), MEP engineering loads (HVAC, electrical, water supply and drainage), resort price benchmarks and unit economics financial model.

Net usable area NUA
—
no area norm
Treatment stations
1 station
Type: T5
Equipment CapEx
—
0 items
CapEx Finishes / MEP
—
—
Total investment
—
Turnkey incl. VAT
Payback period
— mo
Base scenario

Thermal-zone brick: norms and capacity

industry norms

The brick is self-sufficient and not part of the typical project: area is a range where the norms give one, climate and MEP follow industry norms, capacity is a set of scenarios from real resorts.

Area

The norms set no area: it follows from the number of places.

Climate
Air temperature
40–48 °C
Relative humidity
≤ 100 %
Temperature of seats and loungers
32–36 °C
Bench temperature
36–37 °C
Cool-down between sessions
12–20 min
MEP and plant space
Air changes
4–6 ACH
Plant cabinet from the room, at most
≤ 5 m
Steam pipe
40 mm
Ceiling above the head on the top bench, at most
≤ 200 mm
Floor drain
≥ 42 l/min

Capacity: scenarios from real resorts, places

Minimum—
Mean—
Median—
Maximum—

Data is being collected: the scenarios appear once capacities of real resorts are in.

Equipment classes
Steam room / hammam (prefabricated)Steam generator

Industry norms, our wording · climate of all zones in the SPA section

🏛 1. Architectural and planning parameters and zoning

Total area: 0.0 m²

Building requirements and finishing materials (SanPiN)

Cleanliness class:—
Wet point:Required (cold + hot water + drain)
Ceiling height:≥ 3.0 m (clear height)
Door opening width:≥ 1.0–1.2 m (medical standard)
Floor covering:Homogeneous antistatic linoleum
Wall finish:Moisture-resistant paint / disinfectant resistance

⚡ 2. Engineering and technology profile (MEP)

Electrical 18.0 kW · HVAC +4/-6

Electrical (power supply)

Installed power:
18.0 kW
Design power (Kd=0.72):
18.0 kW
Cable lines:
1 beams
Distribution board:
230V / 50Hz
Residual current protection (RCD):
УЗО 10мА/30мА медицинского типа
Medical UPS:
Not required

HVAC (ventilation & SanPiN)

SanPiN cleanliness class:
—
Supply air exchange:
+4 ACH
Exhaust air exchange:
-6 ACH
Temperature:
воздух 40–48 °C
Humidity:
≤ 100 %
Gas destruction:
General ventilation filtration

Water supply & drainage and safety

Cold/hot water points:
1 stations (elbow-operated)
Floor drains:
1 pcs (dry trap)
Water treatment:
Standard cold water filtration
Clinical and technological rationale for synergy
Automatic fire alarm, type 2-3 warning and evacuation system, powder/gas fire extinguishers
Nurse call system:
Installed at stations

🔬 3. Medical and spa equipment specification (CapEx)

—
№ Equipment name Brand / Manufacturer Country Ministry of Health registration certificate Qty Unit price Amount (CapEx)
Equipment specification total: —

📋 4. Medical services nomenclature and clinical protocols

0 services
Code Unified directory service Market median Facilities Procedure passport
Room without medical services (ancillary)

📊 5. Comparative price benchmarking of leading resorts in Russia

Price analytics in the Knowledge Base

Summary price statistics by service category (10 resorts in Russia)

Category Min P25 Median P50 P75 Max Segment leader MEDISPA rec.
Clinical consultation 1 000 ₽ 2 900 ₽ 4 500 ₽ 6 800 ₽ 9 750 ₽ Medical Spa / Premium segment 7 150 ₽

💰 6. Unit economics financial model and payback scenario analysis

Payback — mo
Model scenario OCC occupancy Visits/year Revenue per year Gross profit (60%) CapEx payback
Conservative 35% 0 — — — mo
Base (MEDISPA.PRO plan) 60% 0 — — — mo
Optimistic 75% 0 — — — mo

Ancillary room: it has no procedures of its own, so revenue is not calculated.

📚 7. International evidence base (PubMed Evidence Base)

2 studies

🔄 8. End-to-end patient pathway and interdisciplinary synergy

4 stages
Pathway stage Linked treatment room Fire safety:
Admission diagnostics 1.2.1 Ultrasound and functional diagnostics room Screening of baseline morphofunctional status, exclusion of contraindications and mapping of treatment areas.
Medical case conference 1.1.1 Integrative preventive medicine physician's office Development of a personalised rehabilitation programme and prescription of treatment courses.
Metabolic synergy 1.3.1 Treatment room for infusion and ozone therapy (IV-Therapy) Support of the cellular antioxidant pool and mitochondrial energy metabolism to enhance response to the treatment.
Effectiveness monitoring 3.1.1 Comprehensive check-up monitoring and bioimpedance room Assessment of changes in phase angle, extracellular water balance and autonomic tone after completing the course.

📜 9. Regulatory and licensing status and medical staff requirements

0 штатных ролей

Russian Ministry of Health regulatory framework

Wellness activity; a thermal-zone brick needs no medical licence.

SanPiN: Industry norms of the thermal zone (climate, MEP, water hygiene); Russian norms as they are collected.

5P medicine & integrative concept profile:

  • M0: Основы интегративной превентивной медицины
  • M6: Клеточный биогенез, митохондриальное здоровье & Longevity

Staffing and qualification requirements

💡 10. Frequently Asked Questions & Engineering Specifications

3 verified answers

Q1 What climate does the Steam room need?

Per industry norms: Air temperature: 40–48 °C; Relative humidity: ≤ 100 %; Temperature of seats and loungers: 32–36 °C; Bench temperature: 36–37 °C; Cool-down between sessions: 12–20 min.

Q2 What area and capacity does the Steam room have?

The industry norms set no area for this zone: it follows from the number of places. Capacities of real resorts are being collected: minimum, mean, median and maximum will appear on this page.

Q3 What MEP and equipment does the Steam room need?

MEP: Air changes: 4–6 ACH; Plant cabinet from the room, at most: ≤ 5 m; Steam pipe: 40 mm; Ceiling above the head on the top bench, at most: ≤ 200 mm; Floor drain: ≥ 42 l/min. Equipment: Steam room / hammam (prefabricated), Steam generator.